[{"lineNumber":10,"itemCode":100,"newItemCode":"513SD20-0001","itemName":"MOBILIZATION ","measure":"LS","quantity":1.0000,"bid1":340000.0000,"bid2":425000.0000,"bid3":451545.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":20,"itemCode":101,"newItemCode":"517SD20-0001","itemName":"CONSTRUCTION SURVEYING CONSTRUCTION ","measure":"LS","quantity":1.0000,"bid1":60000.0000,"bid2":50000.0000,"bid3":160000.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":30,"itemCode":111,"newItemCode":"301SD20-0002","itemName":"CLEARING AND GRUBBING ","measure":"ACRE","quantity":1.2799,"bid1":275000.0000,"bid2":80000.0000,"bid3":46032.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":40,"itemCode":120,"newItemCode":"303SD20-0001","itemName":"REGULAR EXCAVATION ","measure":"CY","quantity":4000.0000,"bid1":40.0000,"bid2":40.0000,"bid3":56.2500,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":50,"itemCode":150,"newItemCode":"303SD20-0010","itemName":"EMBANKMENT ","measure":"CY","quantity":17.0000,"bid1":100.0000,"bid2":150.0000,"bid3":35.0999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":60,"itemCode":155,"newItemCode":"303SD20-0013","itemName":"GEOTEXTILE EMBANKMENT STABILIZATION ","measure":"SY","quantity":49.0000,"bid1":30.0000,"bid2":35.0000,"bid3":11.6499,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":70,"itemCode":1122,"newItemCode":"302SD20-0020","itemName":"12\" CONC. PIPE ","measure":"LF","quantity":29.0000,"bid1":125.0000,"bid2":95.0000,"bid3":197.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":80,"itemCode":1152,"newItemCode":"302SD20-0025","itemName":"15\" CONC. PIPE ","measure":"LF","quantity":375.0000,"bid1":150.0000,"bid2":110.0000,"bid3":142.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":90,"itemCode":1242,"newItemCode":"302SD20-0039","itemName":"24\" CONC. PIPE ","measure":"LF","quantity":71.0000,"bid1":250.0000,"bid2":300.0000,"bid3":178.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":100,"itemCode":6120,"newItemCode":"302SD20-0196","itemName":"12\" END SECTION ES-1 OR 2 ","measure":"EA","quantity":1.0000,"bid1":1250.0000,"bid2":1400.0000,"bid3":2276.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":110,"itemCode":6150,"newItemCode":"302SD20-0198","itemName":"15\" END SECTION ES-1 OR 2 ","measure":"EA","quantity":1.0000,"bid1":1500.0000,"bid2":1450.0000,"bid3":2366.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":120,"itemCode":6740,"newItemCode":"302SD20-0237","itemName":"DROP INLET DI-1 ","measure":"EA","quantity":2.0000,"bid1":6000.0000,"bid2":5500.0000,"bid3":4151.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":130,"itemCode":6825,"newItemCode":"302SD20-0319","itemName":"DROP INLET DI-3B,L=20' ","measure":"EA","quantity":1.0000,"bid1":9000.0000,"bid2":9200.0000,"bid3":11229.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":140,"itemCode":9056,"newItemCode":"302SD20-0662","itemName":"MANHOLE MH-1 OR 2 ","measure":"LF","quantity":1.0000,"bid1":6000.0000,"bid2":5400.0000,"bid3":1643.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":150,"itemCode":10004,"newItemCode":"306SX20-0002","itemName":"NS AGGR. MATERIAL LIGHTWEIGHT AGGREGATE","measure":"CY","quantity":327.0000,"bid1":145.0000,"bid2":80.0000,"bid3":126.5000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":150,"itemCode":10004,"newItemCode":"306SX20-0002","itemName":"NS AGGR. MATERIAL LIGHTWEIGHT AGGREGATE","measure":"CY","quantity":327.0000,"bid1":145.0000,"bid2":80.0000,"bid3":126.5000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":160,"itemCode":10128,"newItemCode":"308SD20-0012","itemName":"AGGR. BASE MATL. TY. I NO. 21B ","measure":"TON","quantity":1276.0000,"bid1":75.0000,"bid2":65.0000,"bid3":60.2500,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":170,"itemCode":10250,"newItemCode":"309SX20-0001","itemName":"NS AGGR. MATERIAL #4 STONE","measure":"TON","quantity":400.0000,"bid1":50.0000,"bid2":65.0000,"bid3":209.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":170,"itemCode":10250,"newItemCode":"309SX20-0001","itemName":"NS AGGR. MATERIAL #4 STONE","measure":"TON","quantity":400.0000,"bid1":50.0000,"bid2":65.0000,"bid3":209.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":180,"itemCode":10628,"newItemCode":"515SD20-0004","itemName":"FLEXIBLE PAVEMENT PLANING  0\" - 2\" ","measure":"SY","quantity":630.0000,"bid1":20.0000,"bid2":15.0000,"bid3":5.9000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":190,"itemCode":10635,"newItemCode":"315SD20-0007","itemName":"ASPHALT CONC.TY. SM-9.5A ","measure":"TON","quantity":798.0000,"bid1":225.0000,"bid2":130.0000,"bid3":143.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":200,"itemCode":10642,"newItemCode":"315SD20-0010","itemName":"ASPHALT CONCRETE TY. BM-25.0A ","measure":"TON","quantity":187.0000,"bid1":200.0000,"bid2":190.0000,"bid3":108.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":210,"itemCode":11070,"newItemCode":"315SX20-0011","itemName":"NS SAW-CUT ASPH CONC FULL DEPTH","measure":"LF","quantity":377.0000,"bid1":10.0000,"bid2":2.5000,"bid3":5.8000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":220,"itemCode":12020,"newItemCode":"502SD20-0011","itemName":"STD. CURB CG-2 ","measure":"LF","quantity":35.0000,"bid1":100.0000,"bid2":45.0000,"bid3":54.2000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":230,"itemCode":12600,"newItemCode":"502SD20-0022","itemName":"STD. COMB. CURB & GUTTER CG-6 ","measure":"LF","quantity":371.0000,"bid1":100.0000,"bid2":50.0000,"bid3":57.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":240,"itemCode":13108,"newItemCode":"504SD20-0002","itemName":"CG-12 DETECTABLE WARNING SURFACE ","measure":"SY","quantity":27.0000,"bid1":650.0000,"bid2":360.0000,"bid3":471.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":250,"itemCode":13220,"newItemCode":"504SD20-0003","itemName":"HYDRAULIC CEMENT CONC. SIDEWALK 4\" ","measure":"SY","quantity":190.0000,"bid1":100.0000,"bid2":43.0000,"bid3":60.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":260,"itemCode":13530,"newItemCode":"506SD20-0002","itemName":"RETAINING WALL RW-3 ","measure":"CY","quantity":750.0000,"bid1":800.0000,"bid2":880.0000,"bid3":1175.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":270,"itemCode":13543,"newItemCode":"506SX20-0002","itemName":"NS WALL TRANSLUCENT NOISE WALL","measure":"SF","quantity":754.0000,"bid1":140.0000,"bid2":155.0000,"bid3":162.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":280,"itemCode":13544,"newItemCode":"506SX20-0003","itemName":"NS WALL SOUNDWALL REMOVAL AND REPLACEMENT","measure":"LS","quantity":1.0000,"bid1":20000.0000,"bid2":6000.0000,"bid3":7906.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":290,"itemCode":13603,"newItemCode":"505SP20-0001","itemName":"IMPACT ATTEN. TY. 1 TL-3, LOW MAINTENANCE ","measure":"EA","quantity":4.0000,"bid1":17500.0000,"bid2":6000.0000,"bid3":8160.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":300,"itemCode":22645,"newItemCode":"507SD20-0006","itemName":"FENCE FE-CL VINYL COATED ","measure":"LF","quantity":550.0000,"bid1":25.0000,"bid2":23.0000,"bid3":26.5000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":310,"itemCode":22685,"newItemCode":"507SX20-0001","itemName":"FENCE WOOD BOARD ","measure":"LF","quantity":40.0000,"bid1":85.0000,"bid2":82.0000,"bid3":96.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":320,"itemCode":22750,"newItemCode":"507SX20-0017","itemName":"NS PEDESTRIAN FENCE 4 FT. HEIGHT","measure":"LF","quantity":56.0000,"bid1":60.0000,"bid2":52.0000,"bid3":60.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":330,"itemCode":23600,"newItemCode":"507SX20-0013","itemName":"NS FENCE TREE PROTECTION","measure":"LF","quantity":1200.0000,"bid1":15.0000,"bid2":4.5000,"bid3":14.3999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":340,"itemCode":24150,"newItemCode":"512SD20-0012","itemName":"TYPE 3 BARRICADE 4' ","measure":"EA","quantity":2.0000,"bid1":200.0000,"bid2":365.0000,"bid3":258.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":350,"itemCode":24152,"newItemCode":"512SD20-0013","itemName":"TYPE 3 BARRICADE 8' ","measure":"EA","quantity":18.0000,"bid1":200.0000,"bid2":490.0000,"bid3":258.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":360,"itemCode":24160,"newItemCode":"512SD20-0014","itemName":"TEMPORARY (CONSTRUCTION) SIGN ","measure":"SF","quantity":1838.0000,"bid1":26.0000,"bid2":40.0000,"bid3":17.7500,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":370,"itemCode":24278,"newItemCode":"512SD20-0024","itemName":"GROUP 2 CHANNELIZING DEVICES ","measure":"DAY","quantity":28000.0000,"bid1":1.5000,"bid2":0.7500,"bid3":0.9499,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":380,"itemCode":24279,"newItemCode":"512SD20-0025","itemName":"PORTABLE CHANGEABLE MESSAGE SIGN ","measure":"HR","quantity":2000.0000,"bid1":7.0000,"bid2":16.0000,"bid3":18.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":390,"itemCode":24281,"newItemCode":"512SD20-0026","itemName":"ELECTRONIC ARROW BOARD ","measure":"HR","quantity":2000.0000,"bid1":4.0000,"bid2":2.5000,"bid3":4.1999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":400,"itemCode":24288,"newItemCode":"512SD20-0029","itemName":"WARNING LIGHT TY. B ","measure":"DAY","quantity":2000.0000,"bid1":3.0000,"bid2":0.3000,"bid3":60.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":410,"itemCode":24290,"newItemCode":"512SD20-0031","itemName":"TRAFFIC BARRIER SERVICE CONC. MB-7D PC ","measure":"LF","quantity":1100.0000,"bid1":58.0000,"bid2":30.0000,"bid3":35.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":420,"itemCode":24410,"newItemCode":"508SD20-0002","itemName":"DEMOLITION OF PAVEMENT COMBINATION ","measure":"SY","quantity":572.0000,"bid1":28.0000,"bid2":25.0000,"bid3":13.3000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":430,"itemCode":24420,"newItemCode":"508SD20-0003","itemName":"DEMOLITION OF PAVEMENT RIGID ","measure":"SY","quantity":45.0000,"bid1":55.0000,"bid2":70.0000,"bid3":88.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":440,"itemCode":24430,"newItemCode":"508SD20-0004","itemName":"DEMOLITION OF PAVEMENT FLEXIBLE ","measure":"SY","quantity":433.0000,"bid1":40.0000,"bid2":9.0000,"bid3":9.6000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":450,"itemCode":25004,"newItemCode":"504SD20-0015","itemName":"HANDRAIL HR-1 TYPE III ","measure":"LF","quantity":700.0000,"bid1":120.0000,"bid2":145.0000,"bid3":138.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":460,"itemCode":25565,"newItemCode":"108SP20-0001","itemName":"BASELINE PROGRESS SCHEDULE ","measure":"LS","quantity":1.0000,"bid1":10000.0000,"bid2":100.0000,"bid3":12000.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":470,"itemCode":25567,"newItemCode":"108SP20-0002","itemName":"PROGRESS SCHEDULE UPDATES ","measure":"EA","quantity":11.0000,"bid1":400.0000,"bid2":100.0000,"bid3":480.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":480,"itemCode":27023,"newItemCode":"602SD20-0004","itemName":"TOPSOIL CLASS B ","measure":"CY","quantity":70.0000,"bid1":50.0000,"bid2":125.0000,"bid3":132.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":490,"itemCode":27102,"newItemCode":"603SD20-0003","itemName":"REGULAR SEED ","measure":"LB","quantity":200.0000,"bid1":19.0000,"bid2":31.0000,"bid3":36.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":500,"itemCode":27327,"newItemCode":"606SD20-0007","itemName":"ROLLED EROSION CTRL PRODUCT EC-3 TYPE 3 ","measure":"SY","quantity":450.0000,"bid1":4.0000,"bid2":3.5999,"bid3":4.1999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":510,"itemCode":27415,"newItemCode":"303SD20-0023","itemName":"CHECK DAM ROCK TY. II ","measure":"EA","quantity":18.0000,"bid1":450.0000,"bid2":600.0000,"bid3":1425.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":520,"itemCode":27451,"newItemCode":"303SD20-0030","itemName":"INLET PROTECTION TYPE A ","measure":"EA","quantity":6.0000,"bid1":500.0000,"bid2":500.0000,"bid3":576.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":530,"itemCode":27461,"newItemCode":"303SD20-0031","itemName":"INLET PROTECTION TYPE B ","measure":"EA","quantity":5.0000,"bid1":300.0000,"bid2":375.0000,"bid3":440.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":540,"itemCode":27505,"newItemCode":"303SD20-0034","itemName":"TEMP. SILT FENCE TYPE A ","measure":"LF","quantity":1681.0000,"bid1":3.0000,"bid2":6.5000,"bid3":4.1999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":550,"itemCode":38900,"newItemCode":"605SX20-0018","itemName":"NS PLANT OR TREE 1.5\" CAL.","measure":"EA","quantity":132.0000,"bid1":260.0000,"bid2":205.0000,"bid3":240.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":560,"itemCode":39001,"newItemCode":"605SX20-0019","itemName":"NS TREE REMOVAL, TRIM, AND DISPOSAL OF TREES W/ STUMPS","measure":"EA","quantity":56.0000,"bid1":1750.0000,"bid2":2000.0000,"bid3":2500.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":570,"itemCode":42765,"newItemCode":"510SD20-0050","itemName":"ADJUST EXIST FRAME & COVER ","measure":"EA","quantity":1.0000,"bid1":450.0000,"bid2":500.0000,"bid3":1762.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":580,"itemCode":50108,"newItemCode":"701SD20-0001","itemName":"SIGN PANEL ","measure":"SF","quantity":48.0000,"bid1":45.0000,"bid2":29.0000,"bid3":39.5999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":590,"itemCode":50436,"newItemCode":"700SD20-0037","itemName":"SIGN POST STP-1, 2 1/2\", 12 GAUGE ","measure":"LF","quantity":14.0000,"bid1":30.0000,"bid2":37.0000,"bid3":23.5000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":600,"itemCode":50486,"newItemCode":"700SD20-0039","itemName":"CONCRETE SIGN FOUNDATION STP-1, TYPE B ","measure":"EA","quantity":14.0000,"bid1":700.0000,"bid2":350.0000,"bid3":642.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":610,"itemCode":51170,"newItemCode":"700SD20-0060","itemName":"ELECTRICAL SERVICE SE-5 ","measure":"EA","quantity":2.0000,"bid1":4000.0000,"bid2":2800.0000,"bid3":3636.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":620,"itemCode":51930,"newItemCode":"700SX20-0027","itemName":"NS REMOVE EXISTING SIGN STRUCTURE .","measure":"EA","quantity":3.0000,"bid1":350.0000,"bid2":275.0000,"bid3":318.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":630,"itemCode":51932,"newItemCode":"700SX20-0029","itemName":"NS RELOCATE EXISTING SIGN PANEL .","measure":"EA","quantity":3.0000,"bid1":350.0000,"bid2":310.0000,"bid3":366.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":640,"itemCode":51933,"newItemCode":"703SD20-0044","itemName":"REMOVE EXISTING POLE ","measure":"EA","quantity":2.0000,"bid1":1600.0000,"bid2":1200.0000,"bid3":1380.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":650,"itemCode":54020,"newItemCode":"704SD20-0001","itemName":"TYPE A PVMT LINE MRKG 4\" ","measure":"LF","quantity":400.0000,"bid1":3.0000,"bid2":0.4000,"bid3":3.5999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":660,"itemCode":54028,"newItemCode":"704SD20-0005","itemName":"TYPE A PAVEMENT LINE MRKG 24\" ","measure":"LF","quantity":12.0000,"bid1":10.0000,"bid2":7.3000,"bid3":4.8000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":670,"itemCode":54032,"newItemCode":"704SD20-0006","itemName":"TYPE B CLASS I PVMT LINE MRKG 4\" ","measure":"LF","quantity":735.0000,"bid1":3.0000,"bid2":0.8999,"bid3":1.3999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":680,"itemCode":54042,"newItemCode":"704SD20-0010","itemName":"TYPE B CLASS I PAVE. LINE MARKING 24\" ","measure":"LF","quantity":456.0000,"bid1":12.0000,"bid2":8.5000,"bid3":8.8800,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":690,"itemCode":54043,"newItemCode":"704SD20-0011","itemName":"TYPE B CLASS II PAVE. LINE MARKING 4\" ","measure":"LF","quantity":3325.0000,"bid1":5.0000,"bid2":2.7000,"bid3":4.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":700,"itemCode":54105,"newItemCode":"512SD20-0042","itemName":"ERADICATE EXIST. LINEAR PVMT MARKING ","measure":"LF","quantity":3325.0000,"bid1":2.0000,"bid2":0.8999,"bid3":0.9200,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":710,"itemCode":55080,"newItemCode":"700SD20-0144","itemName":"8 CONDUCTOR CABLE ","measure":"LF","quantity":3718.0000,"bid1":3.0000,"bid2":1.7500,"bid3":2.0399,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":720,"itemCode":55100,"newItemCode":"700SD20-0145","itemName":"10 CONDUCTOR CABLE ","measure":"LF","quantity":1892.0000,"bid1":2.0000,"bid2":1.3500,"bid3":1.5599,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":730,"itemCode":55586,"newItemCode":"700SD20-0177","itemName":"JUNCTION BOX JB-S1 ","measure":"EA","quantity":13.0000,"bid1":1400.0000,"bid2":1100.0000,"bid3":1200.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":740,"itemCode":56050,"newItemCode":"700SD20-0191","itemName":"BORED CONDUIT 2\" ","measure":"LF","quantity":150.0000,"bid1":100.0000,"bid2":90.0000,"bid3":102.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":750,"itemCode":56053,"newItemCode":"700SD20-0194","itemName":"2\" PVC CONDUIT ","measure":"LF","quantity":1700.0000,"bid1":16.0000,"bid2":12.0000,"bid3":13.8000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":760,"itemCode":56200,"newItemCode":"700SD20-0197","itemName":"TRENCH EXCAVATION ECI-1 ","measure":"LF","quantity":1700.0000,"bid1":15.0000,"bid2":12.0000,"bid3":13.1999,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":770,"itemCode":59000,"newItemCode":"705SX20-0002","itemName":"NS LIGHTING 4' BOLLARD PATH LIGHTING","measure":"EA","quantity":28.0000,"bid1":4000.0000,"bid2":3050.0000,"bid3":3600.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":780,"itemCode":59000,"newItemCode":"705SX20-0002","itemName":"NS LIGHTING TYSONS STANDARD ROADWAY/PATHWAY LIGHTING","measure":"EA","quantity":10.0000,"bid1":5000.0000,"bid2":4050.0000,"bid3":4800.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":790,"itemCode":59001,"newItemCode":"700SX20-0013","itemName":"NS LIGHTING PEDESTRIAN BRIDGE RAIL LIGHTING","measure":"LF","quantity":910.0000,"bid1":590.0000,"bid2":450.0000,"bid3":510.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":800,"itemCode":60125,"newItemCode":"401SX20-0001","itemName":"NS BRIDGE PREFABRICATED STEEL TRUSS SUPERSTRUCTURE","measure":"LS","quantity":1.0000,"bid1":1620000.0000,"bid2":3612000.0000,"bid3":3600000.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":810,"itemCode":60125,"newItemCode":"401SX20-0001","itemName":"NS BRIDGE TEMPORARY SHORING","measure":"LS","quantity":1.0000,"bid1":30000.0000,"bid2":100.0000,"bid3":165660.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":820,"itemCode":60409,"newItemCode":"404SD20-0005","itemName":"CONC. CLASS A4 MOD. LOW SHRINKAGE ","measure":"CY","quantity":29.0000,"bid1":725.0000,"bid2":585.0000,"bid3":1510.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":830,"itemCode":60450,"newItemCode":"316SD20-0035","itemName":"CONC. CLASS A4 BRIDGE APPR. SLAB ","measure":"CY","quantity":10.0000,"bid1":1800.0000,"bid2":950.0000,"bid3":1525.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":840,"itemCode":60452,"newItemCode":"316SD20-0036","itemName":"REINF. STEEL BRIDGE APPR. SLAB ","measure":"LB","quantity":1800.0000,"bid1":1.5000,"bid2":1.2500,"bid3":1.7599,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":850,"itemCode":60495,"newItemCode":"404SD20-0010","itemName":"COVER DEPTH SURVEY ","measure":"SY","quantity":705.0000,"bid1":6.0000,"bid2":4.0000,"bid3":4.8000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":860,"itemCode":61711,"newItemCode":"406SD20-0003","itemName":"CORROSION RESISTANT REINF. STEEL CL. I ","measure":"LB","quantity":3550.0000,"bid1":2.5000,"bid2":2.2500,"bid3":2.8499,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":870,"itemCode":62427,"newItemCode":"420SD20-0014","itemName":"ADHESIVE BASED JOINT SEALER CLASS III, 2\" ","measure":"LF","quantity":38.0000,"bid1":60.0000,"bid2":60.0000,"bid3":84.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":880,"itemCode":64011,"newItemCode":"401SD20-0001","itemName":"STRUCTURE EXCAVATION ","measure":"CY","quantity":562.0000,"bid1":85.0000,"bid2":95.0000,"bid3":95.5000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":890,"itemCode":64015,"newItemCode":"401SD20-0002","itemName":"SELECT BACKFILL ABUTMENT ZONE ","measure":"TON","quantity":440.0000,"bid1":45.0000,"bid2":65.0000,"bid3":67.5000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":900,"itemCode":64032,"newItemCode":"401SD20-0004","itemName":"GEOCOMPOSITE WALL DRAIN ","measure":"SY","quantity":36.0000,"bid1":45.0000,"bid2":85.0000,"bid3":28.7500,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":910,"itemCode":65200,"newItemCode":"406SD20-0006","itemName":"REINF. STEEL ","measure":"LB","quantity":10330.0000,"bid1":1.3999,"bid2":1.2500,"bid3":1.4500,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":920,"itemCode":65211,"newItemCode":"406SD20-0008","itemName":"CORROSION RESISTANT REINF. STEEL CL. I ","measure":"LB","quantity":28690.0000,"bid1":2.5000,"bid2":2.2500,"bid3":2.2500,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":930,"itemCode":66921,"newItemCode":"401SX20-0005","itemName":"NS BRIDGE SUBSTRUCTURE STANDARD EXCAVATION DRILLED SHAFT (36\" DIA)","measure":"LF","quantity":400.0000,"bid1":500.0000,"bid2":400.0000,"bid3":249.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":940,"itemCode":66921,"newItemCode":"401SX20-0005","itemName":"NS BRIDGE SUBSTRUCTURE STANDARD EXCAVATION DRILLED SHAFT (48\" DIA)","measure":"LF","quantity":90.0000,"bid1":500.0000,"bid2":2500.0000,"bid3":550.2500,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":950,"itemCode":66924,"newItemCode":"401SX20-0008","itemName":"NS BRIDGE SUBSTRUCTURE CROSSHOLD SONIC LOGGING (CSL) TESTING","measure":"EA","quantity":10.0000,"bid1":3500.0000,"bid2":1200.0000,"bid3":3192.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":960,"itemCode":66924,"newItemCode":"401SX20-0008","itemName":"NS BRIDGE SUBSTRUCTURE THERMAL INTEGRITY PROFILING","measure":"EA","quantity":10.0000,"bid1":3000.0000,"bid2":2000.0000,"bid3":4233.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":970,"itemCode":67051,"newItemCode":"N/A","itemName":"ARCHITECTURAL TREATMENT ","measure":"SY","quantity":49.0000,"bid1":220.0000,"bid2":330.0000,"bid3":646.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":980,"itemCode":67400,"newItemCode":"419SX20-0006","itemName":"DECK DRAINAGE SYSTEM ","measure":"LS","quantity":1.0000,"bid1":65000.0000,"bid2":77000.0000,"bid3":58440.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":990,"itemCode":68042,"newItemCode":"N/A","itemName":"NS CONCRETE CLASS A3","measure":"CY","quantity":285.0000,"bid1":1100.0000,"bid2":1350.0000,"bid3":500.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":1000,"itemCode":68042,"newItemCode":"N/A","itemName":"NS CONCRETE CLASS A4","measure":"CY","quantity":34.0000,"bid1":1200.0000,"bid2":2200.0000,"bid3":1847.0000,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null},{"lineNumber":1010,"itemCode":68115,"newItemCode":"N/A","itemName":"NS STRUCT. STEEL DRILLED SHAFT REINFORCING STEEL","measure":"LB","quantity":34930.0000,"bid1":1.5000,"bid2":1.2500,"bid3":1.8700,"vendor1":"SHIRLEY CONTRACTING COMPANY, LLC","vendor2":"JOSEPH B. FAY CO.","vendor3":"FORT MYER CONSTRUCTION CORPORATION","contractDesc":"HOT LANES BICYCLE /PEDESTRIAN FACILITIES - PHASE II","metricInd":null}]