[{"lineNumber":10,"itemCode":100,"newItemCode":"513SD20-0001","itemName":"MOBILIZATION","measure":"LS","quantity":1.0000,"bid1":60600.0000,"bid2":75000.0000,"bid3":80000.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":20,"itemCode":101,"newItemCode":"517SD20-0001","itemName":"CONSTRUCTION SURVEYING (CONSTR.)","measure":"LS","quantity":1.0000,"bid1":3000.0000,"bid2":14675.0000,"bid3":10750.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":30,"itemCode":125,"newItemCode":"303SD20-0004","itemName":"GRADING","measure":"LS","quantity":1.0000,"bid1":20000.0000,"bid2":24650.0000,"bid3":19430.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":40,"itemCode":141,"newItemCode":"305SX20-0005","itemName":"NS BORROW EXCAVATION MIN. CBR-5 MIN. CBR-5","measure":"CY","quantity":70.0000,"bid1":30.0000,"bid2":81.0000,"bid3":65.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":50,"itemCode":2092,"newItemCode":"302SX20-0015","itemName":"NS SPEC. DES. PERMANENT CHECK DAM PERMANENT CHECK DAM","measure":"EA","quantity":4.0000,"bid1":2300.0000,"bid2":710.0000,"bid3":1600.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":60,"itemCode":10128,"newItemCode":"308SD20-0012","itemName":"AGGR. BASE MATL. TY. I NO. 21B","measure":"TON","quantity":417.0000,"bid1":45.0000,"bid2":45.0000,"bid3":35.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":70,"itemCode":10628,"newItemCode":"515SD20-0004","itemName":"FLEXIBLE PAVE.PLANING 0\"‐2\"","measure":"SY","quantity":820.0000,"bid1":15.0000,"bid2":14.0000,"bid3":15.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":80,"itemCode":10635,"newItemCode":"315SD20-0007","itemName":"ASPHALT CONCRETE TY. SM‐9.5A","measure":"TON","quantity":92.0000,"bid1":181.5099,"bid2":187.0000,"bid3":165.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":90,"itemCode":10642,"newItemCode":"315SD20-0010","itemName":"ASPHALT CONCRETE TY. BM‐25.0A","measure":"TON","quantity":162.0000,"bid1":183.5399,"bid2":187.0000,"bid3":165.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":100,"itemCode":11070,"newItemCode":"315SX20-0011","itemName":"NS SAW-CUT ASPH CONC FULL DEPTH FULL DEPTH","measure":"LF","quantity":596.0000,"bid1":10.0000,"bid2":2.0000,"bid3":9.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":110,"itemCode":13312,"newItemCode":"505SD20-0028","itemName":"GUARDRAIL TERMINAL GR‐7 (NCHRP 350)","measure":"EA","quantity":2.0000,"bid1":2160.0000,"bid2":2200.0000,"bid3":2000.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":120,"itemCode":13345,"newItemCode":"505SD20-0038","itemName":"ALT.BREAKAWAY CABLE TERM.(GR‐9)","measure":"EA","quantity":2.0000,"bid1":2628.0000,"bid2":2675.0000,"bid3":2350.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":130,"itemCode":13383,"newItemCode":"505SD20-0045","itemName":"FIXED OBJECT ATTACH. GR‐FOA‐1 TY. I","measure":"EA","quantity":4.0000,"bid1":1908.0000,"bid2":1950.0000,"bid3":1750.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":140,"itemCode":24152,"newItemCode":"512SD20-0013","itemName":"TYPE III BARRICADE 8'","measure":"EA","quantity":7.0000,"bid1":300.0000,"bid2":510.0000,"bid3":250.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":150,"itemCode":24160,"newItemCode":"512SD20-0014","itemName":"CONSTRUCTION SIGNS","measure":"SF","quantity":525.0000,"bid1":20.0000,"bid2":36.0000,"bid3":16.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":160,"itemCode":24279,"newItemCode":"512SD20-0025","itemName":"PORT.CHANGEABLE MESS. SIGN","measure":"HR","quantity":1000.0000,"bid1":11.2500,"bid2":9.0000,"bid3":4.2500,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":170,"itemCode":24288,"newItemCode":"512SD20-0029","itemName":"WARNING LIGHT TY. B","measure":"DAY","quantity":1080.0000,"bid1":6.0000,"bid2":4.0000,"bid3":1.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":180,"itemCode":24430,"newItemCode":"508SD20-0004","itemName":"DEMO. OF PAVEMENT (FLEXIBLE)","measure":"SY","quantity":68.0000,"bid1":15.6000,"bid2":18.0000,"bid3":25.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":190,"itemCode":24602,"newItemCode":"510SX20-0016","itemName":"NS REMOVE EXIST. FENCE @STR. NO.6332 @STR. NO.6332","measure":"LF","quantity":228.0000,"bid1":21.0000,"bid2":21.0000,"bid3":20.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":200,"itemCode":26127,"newItemCode":"414SD20-0012","itemName":"DRY RIPRAP CL.I 26\"","measure":"TON","quantity":2.5000,"bid1":466.0000,"bid2":122.0000,"bid3":175.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":210,"itemCode":27321,"newItemCode":"606SD20-0004","itemName":"PROTECTIVE COVERING EC‐2","measure":"SY","quantity":229.0000,"bid1":10.0000,"bid2":4.0000,"bid3":5.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":220,"itemCode":27422,"newItemCode":"303SD20-0028","itemName":"DEWATERING BASIN","measure":"EA","quantity":2.0000,"bid1":3500.0000,"bid2":515.0000,"bid3":3500.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":230,"itemCode":27430,"newItemCode":"303SD20-0029","itemName":"SILTATION CONTROL EXCAVATION","measure":"CY","quantity":204.0000,"bid1":5.0000,"bid2":76.0000,"bid3":10.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":240,"itemCode":27505,"newItemCode":"303SD20-0034","itemName":"TEMP. SILT FENCE","measure":"LF","quantity":246.0000,"bid1":10.0000,"bid2":3.5000,"bid3":2.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":250,"itemCode":27506,"newItemCode":"N/A","itemName":"TEMP. FILTER BARRIER","measure":"LF","quantity":906.0000,"bid1":6.0000,"bid2":3.5000,"bid3":1.5000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":260,"itemCode":28820,"newItemCode":"N/A","itemName":"WATERING","measure":"UNIT","quantity":6.0000,"bid1":300.0000,"bid2":334.0000,"bid3":285.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":270,"itemCode":28864,"newItemCode":"N/A","itemName":"VEGETATION CONTROL","measure":"UNIT","quantity":5.0000,"bid1":3000.0000,"bid2":607.0000,"bid3":550.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":280,"itemCode":39001,"newItemCode":"605SX20-0019","itemName":"NS TREE EASTERN RED CEDAR EASTERN RED CEDAR","measure":"EA","quantity":32.0000,"bid1":144.0000,"bid2":340.0000,"bid3":300.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":290,"itemCode":54032,"newItemCode":"704SD20-0006","itemName":"TY.B CL.I PAVE. LINE MARK. 4\"","measure":"LF","quantity":376.0000,"bid1":10.1899,"bid2":2.5000,"bid3":5.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":300,"itemCode":61126,"newItemCode":"405SD20-0004","itemName":"PRESTR.CONC.SLAB 3'X15\"X(+25'‐30'","measure":"EA","quantity":8.0000,"bid1":11715.4003,"bid2":11350.0000,"bid3":15500.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":310,"itemCode":61200,"newItemCode":"405SX20-0001","itemName":"NS PRESTRESSED CONCRETE BEAM SOLID SLAB 3'X15\" (+25'-30') SOLID SLAB 3'X15\" (+25'-30')","measure":"EA","quantity":2.0000,"bid1":10123.0000,"bid2":11500.0000,"bid3":15750.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":310,"itemCode":61200,"newItemCode":"405SX20-0001","itemName":"NS PRESTRESSED CONCRETE BEAM SOLID SLAB 3'X15\" (+25'-30') SOLID SLAB 3'X15\" (+25'-30')","measure":"EA","quantity":2.0000,"bid1":10123.0000,"bid2":11500.0000,"bid3":15750.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":320,"itemCode":62045,"newItemCode":"410SD20-0017","itemName":"RAILING, BR27D 2 RAILS","measure":"LF","quantity":58.0000,"bid1":367.0000,"bid2":580.0000,"bid3":455.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":330,"itemCode":62201,"newItemCode":"N/A","itemName":"WATERPROOFING","measure":"SY","quantity":90.0000,"bid1":50.0000,"bid2":42.0000,"bid3":80.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":340,"itemCode":62532,"newItemCode":"410SX20-0003","itemName":"NS BRIDGE SUPERSTRUCTURE CONCRETE FORMLINER CONCRETE FORMLINER","measure":"SF","quantity":120.0000,"bid1":15.0000,"bid2":43.0000,"bid3":60.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":350,"itemCode":64005,"newItemCode":"N/A","itemName":"SELECT MATL. TY. I MIN. CBR‐30","measure":"TON","quantity":510.0000,"bid1":35.0000,"bid2":46.0000,"bid3":28.5000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":360,"itemCode":64011,"newItemCode":"401SD20-0001","itemName":"STRUCTURE EXCAVATION","measure":"CY","quantity":498.0000,"bid1":85.0000,"bid2":66.0000,"bid3":82.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":370,"itemCode":64020,"newItemCode":"N/A","itemName":"DRILLED HOLES","measure":"LF","quantity":400.0000,"bid1":268.5000,"bid2":462.0000,"bid3":625.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":380,"itemCode":64036,"newItemCode":"401SD20-0005","itemName":"PIPE UNDERDRAIN 6\"","measure":"LF","quantity":20.0000,"bid1":45.0000,"bid2":110.0000,"bid3":15.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":390,"itemCode":64112,"newItemCode":"403SD20-0006","itemName":"STEEL PILES 12\"","measure":"LF","quantity":950.0000,"bid1":68.0000,"bid2":39.0000,"bid3":40.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":400,"itemCode":65013,"newItemCode":"404SD20-0011","itemName":"CONCRETE CLASS A3","measure":"CY","quantity":135.8000,"bid1":666.4000,"bid2":465.0000,"bid3":540.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":410,"itemCode":65093,"newItemCode":"404SD20-0015","itemName":"CONCRETE CLASS T3","measure":"CY","quantity":46.5999,"bid1":315.0000,"bid2":310.0000,"bid3":200.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":420,"itemCode":65828,"newItemCode":"N/A","itemName":"RAILING, BR27D 2 RAILS","measure":"LF","quantity":22.0000,"bid1":315.0000,"bid2":475.0000,"bid3":350.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":430,"itemCode":66120,"newItemCode":"401SD20-0007","itemName":"COFFERDAM","measure":"EA","quantity":2.0000,"bid1":11245.0000,"bid2":27600.0000,"bid3":25000.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":440,"itemCode":66631,"newItemCode":"414SX20-0007","itemName":"NS RIPRAP STONE RIPRAP, 18\" STONE RIPRAP, 18\"","measure":"TON","quantity":57.0000,"bid1":200.0000,"bid2":194.0000,"bid3":53.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":450,"itemCode":66922,"newItemCode":"401SX20-0006","itemName":"NS BRIDGE SUBSTRUCTURE CONCRETE FORMLINER CONCRETE FORMLINER","measure":"SF","quantity":610.0000,"bid1":15.0000,"bid2":43.0000,"bid3":25.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null},{"lineNumber":460,"itemCode":67900,"newItemCode":"413SX20-0002","itemName":"NS DISM. & REM. EXIST. STR. NO. 6332 NO. 6332","measure":"LS","quantity":1.0000,"bid1":65000.0000,"bid2":65300.0000,"bid3":105700.0000,"vendor1":"FORT MYER CONSTRUCTION CORPORATION","vendor2":"FLIPPO CONSTRUCTION COMPANY, INC.","vendor3":"MARTINS CONSTRUCTION CORP.","contractDesc":"PROP. BRIDGE & APPROACHES OVER JOHNNY MOORE CREEK","metricInd":null}]